Complete Carbonated Soft Drink Factory Filling Plant Starting Project Machines

Product Details
Customization: Available
Type: Gravity Filling Type
Automatic Grade: Automatic
Manufacturer/Factory & Trading Company

360° Virtual Tour

Diamond Member Since 2008

Suppliers with verified business licenses

Audited Supplier

Audited by an independent third-party inspection agency

Number of Employees
29
Year of Establishment
2008-03-04
  • Complete Carbonated Soft Drink Factory Filling Plant Starting Project Machines
  • Complete Carbonated Soft Drink Factory Filling Plant Starting Project Machines
  • Complete Carbonated Soft Drink Factory Filling Plant Starting Project Machines
  • Complete Carbonated Soft Drink Factory Filling Plant Starting Project Machines
  • Complete Carbonated Soft Drink Factory Filling Plant Starting Project Machines
  • Complete Carbonated Soft Drink Factory Filling Plant Starting Project Machines
Find Similar Products

Basic Info.

Material Type
Liquid
Filling Valve Head
Multi-Head
Feed Cylinder Structure
Single-Room Feeding
Dosing Device
Induction
Filling Principle
Gravity Filling
Packaging Container Lifting Structure
Gripper
Structure
Rotary
Packaging
Bottle
Packaging Material
Standard Packing
Materil
SUS304
Capacity
1000-18000 Bph
Volume
0.1-2L
Model
Cgf
Labeling01
Automatic Sleeve Labeling Machine
Labeling02
Automatic Ashesive Labeling Machine
Final Packing
Automatic Film Shrink Packing Machine
Payment
T/T, L/C
Transport Package
Wooden Case
Specification
2700*2400*2500
Trademark
King Machine
Origin
China
Production Capacity
10PCS/Month

Product Description

Complete Carbonated Soft Drink Factory Filling Plant Starting Project Machines
King machine 3 in 1 beverage filling machine and the packing machines are mainly designed for water and beverage filling and packing. It combines rinsing and filling and capping as one automatic unit,it is suitable for PET or other plastic bottles. The micro-negative pressure filling technology is adopted enabling it to fill more efficiently and more stably with more output than the machine of the same level from others.
High automation and easy operation make it an ideal option for beverage companies. 

Nowadays,more and more people are thinking about to start the water business every place all over the world,especially in Africa.It is a smart idea to start the water business,low cost,big profit.and it will grow very fast.
Our customers who buy our water production machine,have grown from a small water facotory to the main water supplier in local place within only 4 years.



Machine Details
The CGF model filling machine is the most popular model in the beverage filling business,3 in 1 filling machine combines bottle washing,filling and capping together,the whole set of machine become stable and efficient.

New CGF Model 3 in 1 Filling Machine
Complete Carbonated Soft Drink Factory Filling Plant Starting Project Machines

Using Stainless steel pipe instead of plastic one,it will not be broken
With King Machine unique design of wire control system,engineer can pause and start the machine any time

King Machine complete beverage production line-Iraq project in Picture
Complete Carbonated Soft Drink Factory Filling Plant Starting Project Machines


Product Catalog


Different model has different production capacity,base on the needs and request from our customer,we recommend the most suitable model for their business starting.
  Capacity(base on 500ml bottle) Volume
CGF8-8-3   2000bph   0.1-2L 
CGF14-12-4 3000bph  0.1-2L 
CGF16-16-5 4000bph 0.1-2L 
CGF18-18-6 5000-6000bph  0.1-2L 
CGF24-24-8 10000-12000bph  0.1-2L 
CGF32-32-10 13000-15000bph  0.1-2L 
CGF40-40-10 16000-18000bph 0.1-2L 
------------------------------------------------------------------
Complete Water Filling and Packing Line
1.water treatment plant
2.water bottle rinsing filling and capping machine
3.labeling machine
4.film shrink wrapping machine

-----------------------------------------
Factory visiting
We sincerely expecting and welcome your visiting to our factory if when you planed a business trip
1.we will show you the machine in our factory,so you can see the real quality of our machine
2.we will show you a guiding of the whole projection of water production line.
3.we can talk on the project design and price further face to face.
4.we will set up the factory layout for you,to help you start your business quickly.

----------------------------------------
Installation
After the machine arrived in your factory,we will have our engineers to your factory,to install all the machines for you,it will take about 20-30 days.

----------------------------------------
After sale service
Once your machine have any problem you can not solve,we will send our engineers as soon as possible,to avoid financial lost.
----------------------------------------
King Machine Quality
We King machine adopt the better quality technician than some others',to make sure the performance is more brilliant.
Complete Carbonated Soft Drink Factory Filling Plant Starting Project Machines
Complete Carbonated Soft Drink Factory Filling Plant Starting Project Machines


Complete Carbonated Soft Drink Factory Filling Plant Starting Project Machines
Complete Carbonated Soft Drink Factory Filling Plant Starting Project Machines



 
Zhangjiagang King Machine Co., Ltd./Working on the mineral water and beverage production line for 20 years with good quality and service.

 

Send your message to this supplier

*From:
*To:
*Message:

Enter between 20 to 4,000 characters.

This is not what you are looking for? Post a Sourcing Request Now
Contact Supplier